Description
ABB SPCJ4D34-AA
- Technical Specifications (typical SPCJ4D34):
- Function: S100 bus master + cluster interface to controller node
- Link to Controller: Fiber optic ST (820 nm) to INNIS21 / INICT13 (Advant 450) or to CI520A gateway (AC 800M migration)
- S100 Bus: Drives up to N modules (typically 32–64 per cluster; multiple clusters possible)
- Memory: Battery-backed SRAM for I/O image & config; Flash for FW
- Power: From S100 bus PSU module (SPU01) — 5 V / 24 V DC derived
- Indicators: Run, Err, Link Active (to controller), S100 Active LEDs
- Mounting: On S100 termination unit first position OR on small DIN carrier (dep. on version — some SPCJ4 are DIN-mount head-station)
- Operating Temp.: 0 °C to +55 °C
- Firmware: Loaded via Advant Engineering Workbench; must match controller SW version
- Functional Features / Application / Material / Structure / Working Principle / Installation / Precautions:
- In Advant 450 system: install SPCJ4D34 in S100 I/O rack first position → connect fiber to INNIS21 (or INICT13) C.W. port → define cluster in controller config → assign I/O modules (SPCIS22 etc.) → download
- In AC 800M migration: replace SPCJ4D34 + INNIS21 link with CI520A ( Bus Interface for AC 800M) connected to bus where SPCJ4D34 was — AC 800M sees I/O as remote I/O via CI520A
- Precaution: If replacing faulty SPCJ4D34 — backup I/O config exists in controller project; after swap, power up → auto-loads config from controller on first C.W. cycle (green Run LED). Verify bus termination — last module must have 95 Ω terminator plug. Battery on (if separate) should be checked/replaced per PM schedule.
- Handle ESD; do NOT remove/insert with bus powered unless hot-swap confirmed supported (usually yes for cluster — but controller may momentarily mark I/O doubtful — coordinate with ops).





